Operational & Project Excellence

LSS Green Belt Simulator

Master DMAIC methodology and statistical analysis. Designed for professionals aiming for Green Belt certification with practical improvement logic.

  • DMAIC Mastery: Comprehensive quizzes for Define, Measure, Analyze, Improve, and Control.
  • Statistical Logic: Practice data-driven decision making and correct tool selection.
0%
4 votes, 4.8 avg

OPEX Assessment

Self-Assessment-SSYB

Think about the purpose of a problem statement in the initial phase of problem-solving – it's about defining the 'what', not the 'why' or the 'how to fix it'.

1 / 24

A problem statement should not:

(Pick Two)

This metric quantifies the number of errors relative to a large number of possibilities.

2 / 24

DPMO stands for

Consider whether a perfect technical solution is useful if nobody uses it.

3 / 24

Effectiveness of a solution is equal to

Pay attention to the wording which suggests the order is already given.

4 / 24

Select the correct sequence
Six sigma is evolved in periods of - i.evolution, ii. design, iii. Refinement, iv. Results, v. Awareness, vi. Adaption, vii. Enlightenment.

Which belt level gains experience in applying their process knowledge to improvement efforts?

5 / 24

They get exposure of channelizing their Subject knowledge to process improvement opportunities yielding tremendous benefits for self understanding.

Whose needs and expectations are at the center of quality initiatives?

6 / 24

Quality is primarily related to satisfaction viewpoint of

What are the key activities involved in understanding the current state of a process through data?

7 / 24

The MEASURE phase includes

This is a standard acronym in business management related to process transformation.

8 / 24

BPR stands for

This type of flowchart shows how the work is divided among different roles or areas.

9 / 24

Which flowchart categorizes the flow according to the departments or people performing it?

Which role's primary contribution comes from their deep understanding of the process?

10 / 24

They are the spokes of a wheel and can help drive any Six Sigma process to closure by using their process expertise.

Can you have half of a value with this type of data?

11 / 24

Finite number of values is possible and the values cannot be subdivided meaningfully.

What does the "C" in VOC stand for?

12 / 24

At an organization level, we broadly classify VOC into different and distinct categories as

Consider what happens when a sample isn't truly reflective of the larger group you're studying.

13 / 24

A sample that will lead to incorrect conclusions about the population and which will not be representative of the population is

Think about what each letter in the acronym SIPOC represents.

14 / 24

SIPOC as a tool displays a cross-functional set of activities in a single and simple diagram which

Which belt level typically serves as a team member rather than the primary project leader?

15 / 24

They do not lead projects on their own, as does a Green Belt or Black Belt.

This is a fundamental concept in statistical hypothesis testing related to making a wrong decision about the null hypothesis.

16 / 24

P (Reject Ho when Ho is true) is

This type of data describes attributes or categories rather than numerical values.

17 / 24

Qualitative type of data are

These are statistical terms that describe the 'middle' or 'average' of a dataset.

18 / 24

Which of the following is not a measure of central tendency:

What is the main goal after you have defined the problem and collected data in a Six Sigma project?

19 / 24

ANALYZE phase - includes

Think about the visual appearance of the diagram and who developed it.

20 / 24

Cause and Effect diagram is also known as:

(Pick Two)

These are standard statistical techniques for selecting a representative subset from a larger group where each member has a chance of being chosen.

21 / 24

Select type of Probability sampling

Six Sigma is a holistic approach to improving performance and quality.

22 / 24

Six Sigma is a business-driven, multi-dimensional structured approach to:

Six Sigma is a broad methodology with various applications in process improvement.

23 / 24

Six Sigma relates to

Which role brings deep understanding of the existing process to the team?

24 / 24

Six Sigma project cannot reach its completion without the contribution of any of the __________

Your score is

0%

Quitter

0%
14 votes, 4.7 avg

You need to log in to pass this quiz.

Vous devez vous connecter pour passer ce quiz.
0%
7 votes, 4.9 avg

You need to log in to pass this quiz.

Vous devez vous connecter pour passer ce quiz.